Monday, January 4, 2010

Not done yet.

Okay.... so.... I've taken the post-slacking to a new level. Anyway, last time I wrote we were putting in the new windows. Well, we decided at some point to re-side the rest of the original house, rather than leaving it as-is (which was the original plan, for $ reasons). We also decided, if we were going to tear off the rest of the old T-111 and barnboards, we prolly oughta just get rid of the old single-pane windows as well- there were only four left anyway, one of which was broken during demolition of the siding. In the photo below showing the rear of the house, we added in a few studs, replaced a bunch of the insulation, and prepped for new shear plywood and a new rear window.


Here's the east side of the house, showing the old fake-brick asphalt siding which was under the T-111, and the barnboards under that. It was all in pretty poor shape, so it's a good thing we decided to just bite the bullet and get rid of it. Obviously, we went a bit out of order here... ordinarily you'd wrap the house with Tyvek from bottom to top, but of course we changed plans part way through. You can see that the Tyvek is loose at the bottom so the new row can be tucked under.


Here's the old bathroom window removed, with the opening ready to be re-framed (once the big house-rat gets out of the way of course). We chose to make the bottom of the new window a foot or so higher, so it clears the sink and toilet better.


And this next shot shows the east living room window, still to be removed. The existing studs didn't line up with the new layout perfectly, so new studs were added in, and the insulation was refreshed as needed. Now we have extra bearing strength in the east wall, and we also chose to leave the existing diagonal shear braces in place (and, the window framing was improved as well once the window was popped out). Yay.


So now, the next few photos show the house completely wrapped with Tyvek, all the windows are in place, and for practical purposes, the house is ~99% weather-proof (the temporary front door is still there in these photos).




By this point, we had already gotten some snow, although it melted off pretty quick. The old T-111 is leaned againsthe bottom of the house to protect from snowmelt dripping off the roof and splashing from the ground onto the lower side of the house. We'll leave those boards in place until the final siding is installed.


So with the exterior mostly buttoned up, we moved back to the interior. First order of business: finally finish the stairs! Here's a photo of the stringers in place, which as you can see go right through the old front window opening.


The stairs are finally complete! Wheeler admires them, Peanut scrounges for crap to eat, and Renée looks thrilled (she was actually in the middle of tearing out more of the old front wall, until someone interrupted to take a photo). Predictably, the stairs have already become mundane... but it sure was exciting for the first day or so.


Now for some interior framing. In this photo, the back bedroom is framed in, the laundry room is on the right, and the bathroom framing is just starting on the left. It's nice to be inside, as the weather has started getting pretty cold.


Also, we finally built the stairs to the master bedroom mini-closet (or the man-cave, as it's affectionately (derisively?) known). In this photo, the east wall of the master bedroom is in progress as well.


Once most of the interior framing was complete, it was time to get back to some other unfinished business. Pete's weekends are no longer coincident with mine, so he's been doing things here and there on his days off- drywall backing, interior attic wall framing, closet framing, etc. I spent a whole day a few weekends ago digging a new interior pier footing completely by hand, with a trowel, and carting the dirt outside with a bucket. It was time consuming, to say the least. I also had to put a jog in the existing sewer pipe because as luck would have it, it went precisely exactly perfectly directly through the middle of where the new post needed to be. This photo shows the rebar in place (although not quite plumb at the moment), and the sonotube as well (again, not in final position yet), almost ready for concrete. The concrete was super-fun: since it was snowing outside, I had to mix it all in a bucket while underneath the house, a few gallons at a time. The fluffy concrete dust was also fun. It was all fun. You shoulda been there.


In the meantime, the electrician was working away, and I also finished up the rough plumbing, both upstairs and under the house. None of the water lines leak, so that's a good thing (or so I'm told). We had the rough inspection (framing, electrical, plumbing) on the 23rd of December. No major issues, other than the fact that apparently WE HAVE TO HAVE THE HOUSE COMPLETELY COVERED WITH THE FINISHED SIDING BEFORE THE ROUGH FRAMING CAN BE SIGNED OFF! It's not the end of the world though- we were given the go-ahead to install all the insulation, which will be awesome considering the whole winter-time, freezing-temperatures thing that happens up here (a few weeks back when it was getting to around 0 F at night, we could only get the house up to 59 degrees- it was kinda cold). Anyway, we're trying to decide what to do about the siding right now... we thought we could worry about that come springtime, but it was not to be.

Which pretty much brings us to the present day. I got the temporary front door removed this weekend, and put the new front door in. We're going to install a neato window kit into the front door soon, but for now, it's plain white. Here's the opening all prepped for the new door (and some of the electrical wiring can be seen, with spray-foam insulation everywhere to hopefully cut down on heat loss later):

And here's the new door installed. Since the old door didn't fit the opening exactly (it was 6" too small each way), the new door has already reduced the heat-sucking cold air through the addition. Slowly but surely, the whole thing's coming along...

Wednesday, October 7, 2009

So I've been slacking a lot with my posting duties of late, in case you hadn't noticed. I'm going to post a bunch of photos, with only a little text, to bring this thing up to date. Let's start off with a little video during one of the many brief but intense rainshowers of the summer, taken back around early August:


We got a lot of the shear on during August, finished some framing, etc., etc. Here's a photo of the north wall of the kitchen, where the existing washer/dryer is... with a peek of a header that we framed in for a possible future serving-window from the kitchen to the deck:

The house all sheeted, with no windows cut out yet. Note also the gable end outlookers, ready for fascia:
Here's Renée prepping the fascia boards for stain:
Here's a photo of the rafters over the western part of the front bedroom, which is over the kitchen. The fascia boards are installed, blocks in, pretty much ready for the roof sheeting:

And the main part of the roof; all it needs here is the fascia boards at the peak, then it can be covered as well. The fascia took a lot longer than expected, due to needing somewhat precise miter cuts, which were difficult since a lot of the boards were significantly cupped (which was even more annoying since the rough-sawn cedar we used was not cheap at all)... but it turned out pretty good in the end:

Main roof fascia/blocking/gable-end outlookers:
Main rafters, blocking at the peak, upper clerestory windows (and lower roof section sheeted):
Here I am making the last few miter cuts on the 2x6 fascia which caps the 2x12 main fascia boards... note our friendly neighbor Irna in the background:Here's an action shot of Pete cutting out the main rake window at the front of the house. The piece of plywood has just been separated from it's brethren and is making its final journey to the ground:

After sheeting the roof, we ordered a bunch of roofing materials and got the roof taken care of. I would've preferred to go with metal, but with weather looming and the wallet getting lighter, we decided to go with a 40-year comp shingle. Here's the lower roof section completely bituthene'd, drip edge installed, ready for shingles:
Here's the main roof section, with bitch run halfway up (only 2' from the lower wall is required, but I really really really don't want to have to worry about ice dam leaks ever again, so I figured buying an extra roll of bituthene couldn't hurt). Pete's installing the starter shingles at the lower edge:
We got the shingles installed most of the way up, then stopped for the weekend since the gas stove flue and plumbing vent weren't installed yet. We're handling the plumbing vent, and we could certainly do the gas flue as well... but I'd rather have a professional licensed contractor on the hook for it if something goes wrong and the house burns down. Anyway, the flue install went just fine, which was a good thing, since we have no other heat source, and it's been getting into the 20s at night lately. Here's the dogs gettin' toasty by the newly-re-functional stove (note that we also had the stove moved to be further back and more centered in the hearth):
The stove guys siliconed and screwed down the flue jack on top of the 30-lb roofing felt, which dosn't exactly jive with the needed shingle effect to properly shed water. So, rather than cut into the felt, we decided to just run some bituthene under it (properly layered of course) so that it would be nice and leak-free. The bitch is probably a bit of overkill here, but I had some extra and figured it couldn't hurt:
Here's the hole for the plumbing vent, just after being cut out:

And the plumbing vent roof jack being installed:Another shot of the plumbing vent:


And the finished roof... just in time too, as we got a light dusting of snow later in the day:
Which brings us to this past weekend, where we got a bunch of house wrap installed, and actually put in a bunch of windows. The following video shows us putting in the small window in the kitchen. It's small, but getting some southern exposure into the kitchen was actually one of the main goals of the project (note the new garden window in the kitchen as well). We hope to get the majority of the house wrap and window installation done this weekend, after which we'll be almost completely weather-tight! Of course, we'll need insulation and drywall to be completely weather- and temperature-sealed, but that's a ways off still.

Thursday, September 17, 2009

Inspection reflection

So no pictures, just a quick note: we passed our shear and roof inspection today! This inspection was to verify that all of the plywood wall sheeting and roof sheeting was the correct size and properly nailed down... and it was, so now we're cleared to install the finished roof (shingles, metal, whatever we finally decide on) and we can roll out the house wrap, install the windows, put on all the siding, etc. Basically, we can now dry-in the house, so it's weather tight- kind of important, considering winter is on the way. So anyway, it was a good milestone to finally reach.

Monday, September 7, 2009

Ah, where were we?

I don't really know any of the proper construction terms, so I'm not posting much text here ... but I figure most people don't care about that stuff anyway. That said, here are a bunch of photos:


The mud room/front door

Turn around, and you'll see the front of our old house and the stairs to the second floor. See how low the ceiling is in our current kitchen?

Renée sanding fascia before staining

Another view of the front

West side and our old "front" door

Front and east sides of the house

Andy blocking

Our attic will be above those straight pieces of wood (in the triangle of the trusses)


Fascia -- looking over the west side of the house from the roof (we think we're going with siding that will be a similar dark gray)


Rain be damned! We don't need no stinking plastic!

Installing the roof

Tuesday, July 28, 2009

The making of a skyscraper

When I last wrote, we had just finished tilting up the bulk of the upstairs exterior walls. Over the past few weeks we've gotten a lot more done. Of course, since this has been the wettest summer in recent history, we've had to constantly pull plastic sheeting on and off. With exterior walls up, but no roof structure, it makes it quite difficult to pull plastic over the top of everything and not create a giant pool in the middle... but we did our best. The photo below is a little bit deceiving due to the bright blue sky in the background, but believe me, we had some significant rain just a few days prior. In this photo, I'm in the process of pulling off the plastic so we can finish the walls at the closet above the stairs:
A bit of a jump in the photos here. We finished the walls at the closet above the stairs, then over the next week finished the pony wall which sits on top of the main roof beam at the front section of the house. After that, we notched the rafters a few at a time and got them lifted up and nailed in place. It was pretty exciting to see the full shape of the new master bedroom. In the photo below all of the main rafters are in place, along with a few of the smaller ones at the lower roof... and of course, the ever-present plastic sheeting hanging off the side like the proverbial albatross. I'll have to double check, but I seriously don't think we've gone more than two weeks this entire summer without getting some sort of precipitation in KB. There have been more than a couple times where there's been a 10% rain forecast, it's been dry over in Tahoe City all day, and then as I pull into KB after work I notice all of the puddles on the ground... and sure enough, it's poured over here while nowhere else got anything. Have I mentioned how much of a pain the rain has been?

Here's another shot of the rafters in place:

And a photo from the inside. The master bedroom won't exactly be huge from a square footage standpoint, but it should feel quite big, since the ceiling is so high, and with the clerestory windows letting lots of south/west light in.

The Friday before the rafters were all in place, I met with the rep from Reno Truss at the house, so he could take some measurements and make sure his plans were accurate. The next Monday (7/20), I took some final measurements with the rafters in place, so we could be certain the trusses would match the rafters exactly. With the continuous roof plane, even a 1/4" difference would be very noticeable from a distance. So, I got the trusses ordered up and started planning what to do over the 2-3 weeks it would take before the trusses were ready. But then I realized that the trusses hadn't been designed with enough attic space, so we went back and forth a few times, changed some chord and web sizes, and eventually settled on a good design. The trusses also had to be beefed up a bit in a couple webs to avoid needing continuous lateral bracing, which our structural engineer doesn't allow. After finally getting all of the truss details ironed out, everything was settled as of Wed. the 22nd. Amazingly, I got a call on Friday the 24th from Reno Truss, letting me know that the trusses were ready to be delivered! Without a doubt, the fact that all the suppliers are somewhat slow right now has been very convenient for us. We decided to have the trusses delivered on Monday the 27th, since that was a good day for both Pete and me to take the day off from work. In the meantime, we started sheeting the new walls. The photo below shows the lower walls with the shear all shot off, and the lower floor more or less enclosed. We stuck the old side door on there to add a small bit of security. Don't worry; we will be getting a new front door eventually... one without a dog door, hopefully.

Here's a photo this past Monday morning, before the trusses arrived. It's hard to believe we're actually living in that place...

We spent the early part of Monday morning making sure everything was braced off and ready for the trusses to be unloaded. I wasn't quite as nervous as I was before getting concrete, but I wasn't exactly relaxed, either. Most things you can doa little at a time, and correct stuff here and there along the way... but with something like a concrete pour or truss delivery, you only get one shot, and if something's not braced well enough, or even a gust of wind decides to turn the truss bundle into a big wrecking ball, it could be a very bad situation. But, everything actually went quite well, all things considered. Below is a photo of Pete, just after the truss bundle was dropped on the top plates. This illustrates another benefit of the building industry being a bit slow: most of the delivery guys, and in this case, the delivery guy/crane operator, have been around for a while and are pretty good at what they do. The Reno Truss guy did a great job avoiding the trees and not bashing up anything on the house, while dropping the trusses within an inch or so of the perfect spot. Unfortunately, whoever bundled the trusses wasn't nearly as competent, but we'll get to that in a moment.

Once the trusses were dropped, I took a brief video of the proceedings. If you can't tell, I was a bit excited here, even to the point of calling them rafters at one point. But hey, nothing got damaged or dropped, the house didn't collapse when the trusses were released... all in all, it went pretty well:


After the delivery truck was gone, we celebrated with a nice mid-morning beer, then climbed up there to start rolling the trusses into place. The first thing we noticed was that they put the gable-end truss on the wrong side of the bundle... which meant we had to move all the trusses over, finagle them into a reasonable stack laying across the top plates, then pull the gable end truss over to its correct position. Now, that might not sound like too much work, and it wouldn't be, if we were on the ground at the time. But walking around on the plates 20' up, things don't move as fast. Anyway, we lost probably an hour+ due to that, but no big deal. The other problem I noticed (part way through the truss musical chairs ordeal), was that the trusses were built without a couple of the beefier webs we had agreed on. I spoke with truss rep and our engineer, and we'll have to add t-bracing to a bunch of the diagonal webs... not a huge deal, but still a decent amount of extra effort that shouldn't have been necessary. We haven't yet worked out what sort of compensation they're going to give us for the mistake. Regardless, we did get all the trusses rolled out and braced off. The photo below is looking from the master bedroom to the north, at what will be our new attic storage area:

Here's one final photo from down below, with all the major framing components in place (and plastic over the top, as more thunderstorms were predicted for this week... only 10-20% chance though, so not too likely, right?). So of course, we got home today and sure enough, Kings Beach got significantly more rain than anywhere else today (Tahoe City and Truckee each got approxmately zero). As far as I could tell, most places didn't get any... Too bad we didn't do a super great job of covering the house, as we got a decent amount of leakage into the kitchen. Nothing disastrous, but annoying nonetheless. Why couldn't it leak right over the sink? Oh well, them's the breaks.